If you hold a Department of Defense contract or subcontract, the grace period is almost over. The CMMC compliance requirements that were announced years ago are now written into contracts, and the next phase of the rollout begins on November 10, 2026.
CMMC compliance means proving to the DoD that you protect the sensitive information it shares with you. Most small businesses handling Controlled Unclassified Information (CUI) must implement the 110 security requirements in NIST SP 800-171 and pass a Level 2 assessment. Businesses handling only Federal Contract Information (FCI) need Level 1, which is 15 basic practices.
That’s the whole framework in two sentences. The rest of this guide, written by the team at Zia Networks, covers what it means for a company with 10 to 50 people and no dedicated security team.
What Is CMMC, and Why Does It Exist?
CMMC is the verification program established by the Department of Defense for contractors’ cybersecurity. CMMC verifies that contractors within the Defense Industrial Base have implemented the necessary measures to secure sensitive government information, rather than just claiming they have.
Contractors were previously mandated to comply with NIST SP 800-171 through a clause known as DFARS 252.204-7012. The problem was that nobody checked. Companies self-attested, and plenty of those attestations were optimistic at best.
Meanwhile, adversaries kept stealing defense-related data from small suppliers, because small suppliers were the easier door to open. CMMC closes that gap by adding verification.
The program is now codified in federal regulation. The CMMC program rule (32 CFR Part 170) took effect in December 2024, and the acquisition rule that puts CMMC clauses into contracts (48 CFR) took effect in November 2025.
One thing worth saying plainly: CMMC didn’t invent most of these requirements. If your contracts already include DFARS 7012, you were supposed to be doing much of this already. What’s new is the audit.
The 2026 CMMC Timeline: Where We Are Right Now
CMMC rolls out in four phases over three years, starting November 10, 2025. Phase 2, beginning November 10, 2026, is when third-party Level 2 certification starts appearing as a requirement in applicable DoD solicitations.
Phase 2 is approximately a month away at this point. A third-party assessment takes months to schedule and prepare for, and certified assessors are in high demand.
In the case where you are given CMMC requirements by a prime contractor, you will need to show that proof much sooner than a contract officer. The prime does not want to lose a deal due to an unprepared subcontractor.
Always check the current date on the DoD CIO page regarding CMMC.
Here’s how the phases work:
| Phase | Start date | What changes |
| Phase 1 | Nov 10, 2025 | Self-Assessments Level 1 and 2 as required by appropriate solicitations |
| Phase 2 | Nov 10, 2026 | Third-party certification at level C3PAO is mandated if the DoD stipulates |
| Phase 3 | Nov 10, 2027 | Level 3 government-led assessments begin; broader Level 2 certification |
| Phase 4 | Nov 10, 2028 | Full implementation across applicable contracts |
Phase 2 is approximately a month away at this point. A third-party assessment takes months to schedule and prepare for, and certified assessors are in high demand.
In the case where you are given CMMC requirements by a prime contractor, you will need to show that proof much sooner than a contract officer. The prime does not want to lose a deal due to an unprepared subcontractor.
Always check the current date on the DoD CIO page regarding CMMC.
The Three CMMC Levels Explained
CMMC 2.0 has three levels. Level 1 covers basic safeguarding of Federal Contract Information (15 practices). Level 2 protects Controlled Unclassified Information (110 requirements from NIST SP 800-171). Level 3 introduces 24 additional control objectives from NIST SP 800-172 in relation to the most important applications.
| Level 1 | Level 2 | Level 3 | |
| Protects | Federal Contract Information (FCI) | Controlled Unclassified Information (CUI) | CUI tied to critical programs |
| Requirements | 15 practices | 110 requirements | 110 + 24 enhanced |
| Based on | FAR 52.204-21 | NIST SP 800-171 Rev 2 | NIST SP 800-172 |
| Assessment | Annual self-assessment | Self-assessment or C3PAO, depending on the contract | Government-led (DIBCAC) |
| Affirmation | Annually | Annually | Annually |
Which level do you need?
Your contract tells you, but you should understand the logic before you read it.
FCI is information the government gives you or that you generate under a contract, and that isn’t meant for public release. Think of invoices, schedules, and internal contract correspondence. Most contractors handle at least this.
CUI is more sensitive. It’s information the government has decided needs safeguarding, such as technical drawings, export-controlled specifications, or certain engineering data. Look for markings like “CUI” or “CUI//SP-CTI” on documents you receive.
If your company never touches CUI, Level 1 is likely your ceiling. If it does, you’re at Level 2.
A common mistake: companies assume they don’t handle CUI because nobody told them they do. Check your contracts and any documents primes send you. CUI that arrives unmarked is still a problem to resolve with your contracting contact.
CMMC Level 2 Requirements: The 110 Controls in 14 Families
Level 2 of CMMC consists of the application of all 110 security controls in NIST SP 800-171R2, which is categorized into 14 domains, including access control, incident response, and system protection.
Here’s how those 110 break down:
| Family | Requirements | What it covers in plain terms |
| Access Control (AC) | 22 | Who can get into what, and from where |
| System & Communications Protection (SC) | 16 | Encryption, network boundaries, secure connections |
| Identification & Authentication (IA) | 11 | Passwords, multi-factor authentication, unique user IDs |
| Audit & Accountability (AU) | 9 | Logging activity so you can trace what happened |
| Configuration Management (CM) | 9 | Keeping systems in a known, hardened state |
| Media Protection (MP) | 9 | Handling USB drives, backups, paper, disposal |
| System & Information Integrity (SI) | 7 | Patching, malware protection, monitoring |
| Maintenance (MA) | 6 | Controlling who services your equipment |
| Physical Protection (PE) | 6 | Locks, visitor logs, who can enter server areas |
| Security Assessment (CA) | 4 | Testing your own controls, keeping a plan |
| Awareness & Training (AT) | 3 | Teaching staff to spot threats |
| Incident Response (IR) | 3 | A tested plan for when something goes wrong |
| Risk Assessment (RA) | 3 | Finding and ranking vulnerabilities |
| Personnel Security (PS) | 2 | Screening and offboarding |
This table doubles as a rough CMMC 2.0 checklist for orienting yourself. It isn’t a substitute for the real thing, which is the NIST SP 800-171A assessment guide. That document defines how assessors test each requirement.
Where small businesses actually get stuck
Reading the families, you might expect firewalls and encryption to be the hard part. In practice, the technology is the easier half.
The harder half is documentation and evidence. Assessors don’t just ask whether you enforce multi-factor authentication. They ask for the policy, the configuration screenshots, and proof it’s applied to every user who touches CUI.
Three areas trip up small teams most often:
- Scope. Organizations either include too much (too costly) or too little (a flawed assessment). Defining exactly which systems, people, and facilities touch CUI is the most valuable early decision you’ll make.
- Multi-factor authentication. It has to cover remote access, privileged accounts, and network access to CUI systems. Partial rollouts don’t count.
- Cloud services. If a cloud provider stores or processes your CUI, that provider generally must meet FedRAMP Moderate or an equivalent standard. Standard business email and file-sharing plans often don’t qualify.
NIST 800-171 Compliance and Your SPRS Score
Compliance with NIST 800-171 involves ensuring that all 110 security requirements for safeguarding CUI in nonfederal systems are met. The compliance score is measured using the DoD Assessment Methodology to provide a score from 110 to 203, submitted to the Supplier Performance Risk System (SPRS).
Below is an explanation of how the scoring works. One begins with 110. Unimplemented requirements reduce one’s score according to their importance to security. They could take away 1 point, 3 points, or 5 points.
Your score goes into SPRS, and contracting officers can see it. A low or missing score is a competitive disadvantage even before CMMC enforcement reaches your contract.
Can you certify with gaps? Yes, but with limits.
CMMC allows a Plan of Action and Milestones (POA&M) for some unfinished items. To get conditional Level 2 status, you generally need a score of at least 88 out of 110, and your open items must come from the allowed list. You then have 180 days to close them out and complete a final verification.
Several high-impact requirements cannot go on a POA&M at all. Encryption of CUI in transit using validated cryptography, for example, must be in place on day one.
This matters for planning. A mark of 70 does not mean that you are “close”; you will require remediation, which is going to take more time than the typical owner thinks.
CMMC Compliance for Small Business: What It Really Costs
Costs associated with CMMC compliance for a small organization can be broken down into three categories: remediation (closing gaps), tooling (security solutions and compliant cloud services), and assessment fees. The estimate by the DoD itself in its regulatory cost analysis of the final rule places an assessment of a small entity for Level 2 at approximately $100,000 every three years without remediation.
This is a rough estimate by the DoD in its cost analysis in support of the final rule. It should only be used as a reference, and the true cost will depend on your size, scope, and gap from desired capability.
For your information, the same cost analysis estimated a self-assessment cycle of a small entity for Level 2 at approximately $37,000, and $4,000 a year for Level 1. This is for assessment and affirmation activities, not control development.
Here are the typical costs:
- Gap assessment: the first step, and the one that tells you what everything else will cost.
- Remediation: the swing factor. A company with decent IT hygiene may need modest changes. A company running shared logins and unmanaged laptops faces a larger project.
- Compliant tooling: multi-factor authentication, endpoint protection, logging and monitoring, encrypted email, and a compliant cloud environment for CUI.
- Ongoing operation: CMMC isn’t a one-time event. Annual affirmations, log reviews, and policy updates continue indefinitely.
Ways small companies cut the bill
- Reduce your scope. The best approach for controlling costs is to create an “enclave,” which is a smaller, independent space where the CUI exists. Rather than hardening every laptop in your organization, you are hardening only those few that have access.
- Use a compliant cloud enclave. Utilizing an already established and FedRAMP-certified environment can save you from having to redesign your entire network infrastructure.
- Focus on addressing the low-cost, high-point items. A few of the highest-weighted controls may be very low cost to implement.
- Also worth knowing: allowable costs for security compliance can often be recovered through overhead rates on cost-type contracts. Ask your accountant how that applies to your contract types.
CMMC New Mexico: What Local Contractors Should Know
CMMC New Mexico pertains to any organization operating within the state if it processes FCI or CUI under DoD contracts and subcontracting arrangements. The presence of the state’s defense footprint, consisting of Kirtland Air Force Base, White Sands Missile Range, Holloman Air Force Base, and Cannon Air Force Base, makes it likely that several businesses need certification.
New Mexico’s economy has deep ties to defense and national security work. Companies supporting those missions are often small: machine shops, engineering firms, IT service providers, construction companies, and research subcontractors.
None of them have ever viewed themselves as “defense contractors.” Rather, they provide components, services, or even reports to a big company that is a defense contractor. However, CMMC compliance rules apply to subcontracts too, and a prime contractor from another state would likely need your certification to have you in its supply base.
Just to be clear: contracts with the Department of Energy and its national laboratories require a different approach in terms of cybersecurity measures. Be sure you understand which contracts have which requirements.
It would definitely help to find an IT partner that understands both the framework and the regional supply chain.
How to Prepare for CMMC: A Practical Step-by-Step Plan
First, you need to determine what CMMC level is needed in your contracts. You need to define your CUI environment, do a gap assessment using NIST SP 800-171, implement remediation plans, document all of this, and plan for your CMMC assessment. Usually, this process takes about six to twelve months.
The time frame varies; however, be honest with yourself – if your current security standards are low, take the latter. This is the process to follow.
Step 1: Review your contracts and know what you touch
Find DFARS 252.204-7012, 7019, 7020, and 7021. Highlight any CUI labels. Make a list of those that have FCI alone and those that have CUI.
Step 2: Scope definition
Know how CUI comes into your organization, where it’s stored, who accesses it, and how it goes out. You can draw this on a whiteboard if necessary. That becomes your scope.
Step 3: Perform Gap Assessment
Score yourself honestly on all 110 criteria. Follow the DoD Assessment Methodology so that your number will mean something. Businesses that lie about their scores will be in for a shock come real assessment.
Step 4: Create your System Security Plan (SSP)
Your SSP details how you meet all the criteria. This is the document that assessors review first and foremost. Make sure you write it as though addressing someone who is not familiar with your environment.
Step 5: Remediate in order of priority
First, address those that have relatively high weights and/or do not meet the requirements for POA&M. Then address the rest. Maintain a POA&M as evidence.
Step 6: Collect evidence throughout the implementation process
Don’t wait for the assessment month. Take screenshots, configuration dumps, training sign-in sheets, and minutes from meetings as you implement controls. The gathered facts will be more genuine and far less painful.
Step 7: Conduct a mock assessment
Get a completely independent person to check whether you implemented the controls. This is the most economical way to spot problems before they arise.
Step 8: Schedule and perform your assessment
In case of a third-party certification requirement in your contract, you will need a certified C3PAO. Make sure you schedule it in advance since the capacity reduces with the approaching deadline. If self-assessment is allowed, the signing of the affirmation should be made by an executive.
Common CMMC Mistakes We See (and How to Avoid Them)
A few patterns appear again and again across small contractors:
- Treating CMMC as an IT project. It’s an organizational one. Policies, training, HR offboarding, and physical security all count.
- Buying tools before defining scope. Software doesn’t fix an undefined boundary.
- Using consumer-grade or non-compliant cloud tools for CUI. This is the single most common way companies unknowingly fail.
- Relying upon an oral “we do that.” If you can’t demonstrate it, the assessors cannot accept it.
- Waiting for the contract clause to arrive. By then you’re racing a deadline instead of managing a project.
- Overstating readiness in SPRS. A false score isn’t just embarrassing. It creates legal exposure.
CMMC Compliance Requirements FAQ
What are the CMMC compliance requirements for a small business?
Smaller companies need to follow the same rules as larger companies at each level. The first level has 15 security safeguards that need to be followed. The second level has 110 control rules of NIST SP 800-171. Company size does not determine a reduced standard.
Does CMMC apply to subcontractors?
Yes. Prime contractors should cascade CMMC requirements to subcontractors who process FCI or CUI. The appropriate level of CMMC will depend on the kind of information being processed by the subcontractors rather than their size or dollar amount of work being done.
How long does CMMC certification last?
The level two accreditation is only valid for three years, but there should be an annual affirmation of compliance. In case of significant changes in your environment or security incidents, it may be necessary to conduct an assessment earlier.
How do CMMC and NIST 800-171 differ from each other?
SP 800-171 is a list of security controls. CMMC is the certification process to ensure compliance. To put it simply, 800-171 provides the actions to be performed, while CMMC ensures compliance with these requirements
Can I use a plan of action instead of meeting every requirement?
Not completely. For Level 2, if your score is at least 88 out of 110, you can defer low-risk components after being certified. You have to complete them within 180 days. There are no critical elements that can be deferred.
How much does CMMC Level 2 cost?
This can vary greatly. The DoD small entity estimate for a third-party Level 2 assessment is about $100,000 per three-year cycle, minus remediation and tooling costs. It all comes down to where your security posture is today and how narrowly you scope your CUI.
What happens if I’m not CMMC compliant?
If the contract specifies a certain CMMC level, then you cannot be awarded the contract or continue with it without meeting that level. Lying about compliance with CMMC may expose you to a claim under the False Claims Act.
Your Next Step: Turn Requirements Into a Plan
Reading about the requirements for complying with CMMC is helpful. However, having an understanding of where your company stands regarding these requirements is more beneficial.
The first and foremost action that has to be taken into account is that of the scoped gap assessment. This entails a proper assessment of all the necessary contractual obligations as well as the actual number of 110 requirements met.
At Zia Networks, we can help you with just that – from scope definition and gap assessment to remediation, documentation, and assessment readiness. Also, since Phase 2 is scheduled to begin on November 10, 2026, it is these contractors that will stick with their primes.